Company News


2020

05-14

greenhouse technology

Precautions in the process of using oil drilling rig

Some failures will occur when the down-the-hole petroleum mechanical drilling rig is used. Some failures are caused by the quality of the down-the-hole drilling rig itself, and some are caused by improper operation of the down-the-hole drilling rig. Downhole drilling rig failure, maintenance is more troublesome, will delay the construction period. This requires the user of the down-the-hole drill must have a certain understanding of the working principle of the down-the-hole drill. Before the drilling rig of down-the-hole petroleum machinery enters the site, the site must be leveled and the skid and tools must be prepared. After the rig enters the site, the rig must be raised with a skid to keep the tires off the ground and adjust the frame to a horizontal position: after the power is turned on, the motor can be started to raise the mast. After the mast is lifted, the screw at the bottom of the mast is unscrewed and supported on the support. Then install the pull rod, frame leg and guy rope, and adjust the tension degree of the pull rod and guy rope with the screw adjuster. The steel rope of the drilling tool drum of the down-the-hole drilling rig is led out from the drum through the guide pulley and tension pulley of the impact beam and then enters the drilling tool pulley at the top of the mast to hang down, and its end is connected with the drilling tool by the steel rope joint. The steel rope of the mud drum goes through the mud sheave at the top of the mast and hangs down to connect the end with the mud shaft barrel. The down-the-hole drill auxiliary drum is used in conjunction with three crown block at the bottom of the mast.

2020

05-14

greenhouse technology

What are the four ways to classify oil rigs?

With the continuous development of drilling production, the use conditions of drilling rigs are becoming more and more diversified, and various types of drilling rigs have appeared accordingly. Factors affecting the type and composition of the drilling rig are drilling method, drilling depth, hole size and drilling tool size. Conditions in the drilling area (e. g. power or fuel, transportation, meteorological conditions), etc.

2020

05-13

greenhouse technology

Working principle of drilling machine

In the process of sinking, the construction unit shall do a good job of describing each link of the whole drilling process, I .e. detailed construction records, geological histogram, particle analysis results of aquifer sand samples and filter materials, well pipe and filter pipe arrangement structure, well pipe connection mode and other data (including video or photo data), as well as the results of pumping test records.

2020

05-12

greenhouse technology

Safe operation process of drilling rig

During the operation of the drilling machine, it must be carried out in strict accordance with the operation process, because this is the most basic condition to ensure the safety of the work. If you want to make the drilling work safer, then you must pay attention to the drilling machine in the working process. Related safety operation process.

2020

05-11

greenhouse technology

Accessories for water well drilling rigs that require regular maintenance

If any part of the full hydraulic water well drilling rig is found to be abnormal, should it be diagnosed immediately and remedial measures should be taken? Today we meet to see the need for regular maintenance. Maintenance of the filter element: The filter element is used as a filter to filter out impurities in the oil circuit or gas circuit to prevent entry into the system and cause failure. Operation and maintenance manuals. If metal particles are found to adhere to the old filter element, please diagnose immediately, take corrective measures, and use a pure filter element that meets the machine specifications. It is certain that the theoretical analysis results are in good agreement with the actual drilling results. Secondly, azimuth and small formation slope, formation position force, front angle, formation pressure, formation dip, normal cutting anisotropy index of full hydraulic water well drilling rig, formation anisotropy index, borehole direction and formation change direction, or possible direction decrease. Under normal conditions, when the well is formed, the drill bit of the full hydraulic water well drilling rig is close to the normal direction of the formation, and the azimuth angle of the formation changes the direction of the well to the formation. The formation deformation force is zero if the full hydraulic water well rig well direction matches the azimuthal direction of the formation.

2020

05-09

greenhouse technology

The problems that should be paid attention to in the truck-mounted drilling rig

The running-in period is the main link to ensure the normal operation of the pile driver, reduce the failure rate and extend its service life. However, at present, some users neglect the special skill request during the running-in period of the new machine due to the lack of common sense of using the loaded highway pile driver or due to the tight schedule or the desire to obtain income as soon as possible. Some vehicle-mounted drilling rig users even think that the manufacturer has a warranty period anyway, and the manufacturer is responsible for the maintenance of the vehicle-mounted drilling rig machine if it breaks down. As a result, the machine will be overloaded for a long time during the running-in period, resulting in frequent early failures of the vehicle-mounted drilling rig machine. This not only affects the normal application of the machine, shortens the service life of the machine, but also affects the project progress due to the damage of the machine. Therefore, the use and maintenance of the mechanical running-in period should cause adequate respect. 1. The vehicle-mounted drilling rig wears fast Due to the influence of the processing, assembly and adjustment of new machine parts, the friction surface is rough, the contact area of the mating surface is small, and the pressure-bearing state of the surface is uneven. In the running process of the machine, the concave and convex parts of the surface of the parts are fitted and rubbed with each other, and the parts are damaged and the early failure occurs. 2. Poor lubrication of truck-mounted drilling rig Due to the small fit clearance of the newly assembled parts of the truck-mounted drilling rig, and due to assembly and other reasons, it is difficult to ensure the uniformity of the fit clearance. Lubricating oil (grease) is not easy to form a uniform oil film on the friction surface to prohibit wear. Thereby decreasing the lubrication efficiency, resulting in early abnormal wear of the machine parts. In severe cases, it will cause the friction surface of the precise fit to scratch or bite, resulting in failure. 3. Looseness of truck-mounted drilling rig The newly processed and assembled parts have deviations in geometric shape and matching dimensions. In the early stage of application, due to the impact, vibration and other alternating loads, as well as the influence of heat, deformation and other factors, coupled with rapid wear and other reasons, it is easy to Make the originally fastened parts loose. 4. Leakage of truck-mounted drilling rig Due to the looseness of the parts of the truck-mounted drilling rig, vibration and the influence of the heat of the machine, the sealing surface of the machine and the pipe joints will appear leakage. Some shortcomings such as casting and processing are difficult to invent during assembly and debugging. However, due to the vibration and impact in the operation process, this shortcoming is exposed, which is expressed as oil (water) leakage (seepage). Therefore, the run-in period easily emerge leakage phenomenon. 5, truck-mounted drilling rig operation errors Due to the lack of understanding of the structure and performance of the truck-mounted drilling rig machine (especially the new operator), it is easy to cause failures due to operational errors and even cause mechanical accidents.

2020

05-08

greenhouse technology

Taboo of Deep Well Drilling Machine Maintenance

After adjusting the oil supply start time, the reason for checking the stroke margin is because the stroke margin of the plunger is related to the wear of the plunger and the sleeve. After the plunger and sleeve are worn, the plunger needs to move up a little more to start oil supply, which will delay the start of oil supply. When the adjusting bolt is loosened or replaced with a thicker adjusting block or washer, the lower position of the plunger will move upward, thereby reducing the stroke margin of the plunger. Therefore, when repairing and debugging the fuel injection pump, the stroke margin should be checked first to determine whether the fuel injection pump can still be adjusted.

2020

05-08

greenhouse technology

Drilling machine oil thinning reasons

There are shortcomings in the fuel supply system, poor fuel atomization. This will cause fuel or a large amount of excessively rich fuel mixture to enter the crankcase and mix with the oil, which then becomes thin.

2020

05-08

greenhouse technology

Main causes and solutions of problems in workover rig

80% of the problems of workover machinery and equipment occur during the opening of the workover operation. Due to the problems caused by the wear of parts, the workover operation procedure is complicated, and fine cooperation between various parts is required to proceed smoothly. Only a problem with one part in the workover operation can prevent the workover operation from opening smoothly. Therefore, in the selection of parts to choose regular manufacturers and safety assurance information, in the selection of machinery to have advanced production technology and planning scientific and reasonable machinery.

2020

05-06

greenhouse technology

Drilling hole forming process

In the process of drilling and hole forming by crawler drilling rig, according to the change of formation and hole depth, the drilling parameters and drill bit are reasonably selected, and the mud is modulated in time to ensure the hole forming quality. When entering the sand layer and pebble layer, the footage speed should be appropriately slowed down, the consistency of the mud should be improved, and the footage of each drilling return should be reduced to ensure the stability of the hole wall. During drilling construction, the front shovel shall be used to remove the drilling slag in time to ensure the site is clean and tidy, which is conducive to the next construction. After the drilling reaches the required hole depth and the drilling is stopped, pay attention to maintain the slurry surface elevation of the mud in the hole to ensure the stability of the hole wall.
< 1...131415...17 > proceed page