Company News


2022

07-15

greenhouse technology

What are the daily maintenance of oil drilling rigs?

Drilling rig is in the exploration or mineral resources (including solid ore, liquid ore, gas ore, etc.) development, drive the drilling tool to drill underground, access to physical geological data of mechanical equipment. Drilling rig in the daily use of the process of liquid need timely maintenance and maintenance, then the daily maintenance of the rig what. Drilling equipment usually has the following 7 types: 1. Conventional land drilling rig 2. Desert drilling rig 3. Truck-mounted drilling rig 4. Continuous tube working machine 5. Inclined well drilling rig 6. Offshore drilling platform 7. Drilling ship What are the daily maintenance of the drilling rig? Items 1. Rig Periodic Inspection 1, the main structure of the drilling rig, structural connector bolts, structural parts connecting pin shaft, the welding seam of each structural part, hanging basket structure and safety protection conditions to check, especially before entering the site, should ask qualified units to test its safety performance, qualified before use; 2. Regularly check the status of various power heads, working cylinders and drill pipes; 3. Regularly check the drum anti-wire rope falling device of the winch and the height of the edges on both sides, the condition of the drum wall and the number of weeks of the wire rope tail on the drum, especially the condition of the brake mouth should be checked at any time for key items; 4. Inspection of electrical system. The main inspection items are: special electrical box setting, short circuit protection and leakage protection devices, emergency power-off switch, electrical box damping device, cable fixing on working device, lighting circuit and grounding wire are strictly prohibited as current-carrying zero line, etc; Items to be checked at any time by the 2. rig 1. Inspect the consolidation of wire rope end; The contents of wire rope inspection are: wire rope safety circle number, wire rope selection, installation, lubrication, wire rope defect inspection, such as wire rope diameter and wear, wire rope broken number; 2. Check the pulley system of the drilling rig at any time. The main inspection items are: the condition of the pulley body and the anti-skipping rope device of the transition pulley; 3. Check the running system of the drilling rig at any time. The main inspection items are: the running pipe of the pile crane, the condition of the clamping plate and the hook pipe system, the laying of sleepers, etc; Record the rig repair and maintenance 3., and record the replaced parts in detail, so as to ensure that the parts are used within the validity period, or grasp the time of the next replacement at any time; 4. the drilling rig is found to be faulty, the operation shall be stopped immediately and shall not be used until the fault is eliminated.

2022

07-14

greenhouse technology

Maintenance Measures of Oil Drilling Rig

Oil rig manufacturers said that in the actual operation process, due to the high load drilling rig and equipment vibration, so that the oil rig equipment. The probability of barrier occurrence is greater. On the other hand, if the mechanical equipment is not properly maintained and maintained in a timely manner, the mechanical equipment will appear during operation. Failure such as fracture or deformation. The following oil rig will share some maintenance measures. 1. Regularly check the performance of oil drilling rigs Oil rig equipment maintenance and maintenance process, to strengthen the inspection of equipment performance. The rig equipment is in operation for a long time, and the equipment The internal hose will be dry and cracked, which will affect the normal operation of the equipment and cause shutdown in serious cases. Therefore, timely replacement of oil rig equipment Hose, real-time monitoring of the oil state in the tank. If problems are found in the monitoring process, the hydraulic oil should be replaced to ensure that the oil The rig equipment is in normal operation. 2. Strengthen the maintenance of equipment Only by continuously strengthening the management of oil rig equipment and improving the attention of staff to the management of oil field drilling rigs, can the use of oil field drilling rigs It can make the oil rig equipment management more scientific and reasonable. According to the characteristics of the equipment for equipment installation, attention should be paid to multi-directional examination. Consider. The higher the procurement cost of machinery and equipment in oil field enterprises, the greater its function will be, and more advanced technology is needed to operate the machinery and equipment. Make. In addition, during the operation of the equipment, the equipment should be maintained in time. Once problems with the operation of the equipment are found, the equipment should be repaired in time. It can extend the use time of oil drilling rigs and reduce the capital investment of enterprises.

2022

06-23

greenhouse technology

What should be paid attention to when drilling machine is working at low temperature

1. In a low temperature environment, the land will become harder, so when we choose a site, there must be some requirements. The site needs to be leveled and the road needs to be unblocked. Make sure to make sure of that. 2. As we all know, the drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the drilling machine support is firm and reliable, and our staff need to check regularly. Once hidden dangers are found, they should be dealt with in time. Never be careless. 3. When we work at low temperature, although we are in a low temperature state, we cannot ignore the problem of fire prevention. The configuration of fire fighting equipment must be reasonable and meet the fire fighting requirements. 4, low temperature, low temperature, what is the most important thing, of course, our friends at work, pay attention to their own warmth, only their warmth, we can better put into work. 5. The low temperature will definitely have a certain impact on the construction. Here we remind everyone that we must pay attention to keeping warm, pay attention to safety, and ensure our work while ensuring the safety and health of the body.

2022

03-04

greenhouse technology

How to operate oil drilling rig can be more convenient

1. selection of drilling tools and processes should be reasonable Choosing appropriate drilling tools according to the construction geological conditions can not only save fuel but also protect the drill pipe. When drilling is difficult, the drilling speed can be improved by changing the drilling mode through different drilling combinations. In the process of large-diameter pile formation, small-diameter drilling tools are first used for drilling and then large-diameter drilling tools are used for reaming, which can effectively reduce resistance and improve drilling efficiency. The drilling of hard stratum shall be of jog pressure type, the drilling of loose soil stratum shall be of long stroke pressure type, and the pressure raising and pressurizing method shall be selected when drilling floating stone. According to different geology and hardness, the reasonable pressure method shall be selected, which can also improve the construction efficiency of drilling rig and effectively reduce oil consumption. After the drilling tool is filled, the power head shall be properly rotated during lifting, which can reduce the lifting resistance and fuel consumption. The idle speed function of the 2. should be integrated, and the selection of drilling tools and processes should be reasonable. Choosing appropriate drilling tools according to the construction geological conditions can not only save fuel but also protect the drill pipe. When drilling is difficult, the drilling speed can be improved by changing the drilling mode through different drilling combinations. In the process of large-diameter pile formation, small-diameter drilling tools are first used for drilling and then large-diameter drilling tools are used for reaming, which can effectively reduce resistance and improve drilling efficiency. The drilling of hard stratum shall be of jog pressure type, the drilling of loose soil stratum shall be of long stroke pressure type, and the pressure raising and pressurizing method shall be selected when drilling floating stone. According to different geology and hardness, the reasonable pressure method shall be selected, which can also improve the construction efficiency of drilling rig and effectively reduce oil consumption. 3. use idle function to be reasonable Avoid crawler drilling rig long idle, in the short-term shutdown when the use of automatic idle, these small details can achieve the purpose of saving fuel. 4. control the throttle position A working cycle of the crawler drilling rig includes: lowering the drill pipe → drilling with the power head → reverse rotation of the power head → lifting the drill pipe → turning on the vehicle → throwing the soil → turning on the vehicle to reset; Under the same operating conditions, the low-speed engine is used. Low fuel consumption and high fuel efficiency. It is suggested that the operator of the drilling rig should reasonably select the gear according to the comprehensive analysis of geological conditions, construction period and daily workload. The higher the engine speed of the drilling rig, the faster the walking speed and the more fuel consumption. It can be seen that the fuel efficiency of low-speed walking is higher than that of high-speed walking.

2022

03-04

greenhouse technology

Safety precautions for oil workover rig operation

1. Pay attention to concentration during operation, and do not neglect 2. The operation shall be smooth. It is strictly forbidden to lift, release, brake or mound violently. 3. When lifting the derrick, each hydraulic handle should be lifted gently, and pay close attention to the lifting process of the derrick. 4. Reasonable selection of gear and lifting speed according to hook suspension weight 5. Strictly control the lowering speed of the hook to prevent the brake failure and the pier drilling accident 6. When the hanging weight of the hook reaches more than 30 tons, the auxiliary brake should be used to reduce the descent speed of the hook and reduce the wear of the brake block and brake. It is strictly forbidden to hang the water brake on the way of lowering the hook. 7. Pay attention to observe the temperature of circulating cooling water, not more than 66 degrees

2022

02-13

greenhouse technology

Role of power of workover rig

1. The power of the workover rig is generally high-speed diesel engine. In terms of power equipment, it is divided into single engine and dual engine. The single engine is on the car and shared under the car. The dual engine is divided into the car, and the two engines are shared under the car. On the car, one engine supplies power under the car, 2. There are two independent hydraulic systems in the workover rig, the main hydraulic system and the hydraulic power steering system. (1) The primary effect of the main hydraulic system is the vertical release of leveling vehicles and derrick after the workover rig is in place at the well site, as well as auxiliary operations such as hydraulic winch, hydraulic cylinder collapse and hydraulic tongs. (2) The hydraulic power steering system is used to reduce the strength of the rolling steering wheel when the vehicle is running. 3. The workover rig is generally welded with high-strength angle steel and hollow truss structure. The derrick of large-tonnage workover rig can also be welded with high-strength rectangular tubes. The workover rig can have one section and two sections according to different workover rig types. The workover rig of small-tonnage generally selects one derrick. 4. The transmission part generally uses the engine and the hydraulic mechanical gearbox to connect directly. If two engines are shared on and off the car, which requires a parallel car box, the hydraulic mechanical gearbox and the parallel car box, and the angle transmission box. Connect, then connect through the chain and the sand fishing roller or the main roller, then through the chain to the turntable angle transmission box, and the climbing chain box to the turntable. It can also be directly from the parallel car box (angle transmission box) through the transmission shaft to the climbing chain box to the turntable. Sand drum, main drum and turntable are generally controlled by pneumatic push plate clutch, or pneumatic tire clutch 5. The gas circuit system in the workover rig has the primary control effect, such as the clutch, the throttle of the engine, the gear shift of the gearbox, the control of the hydraulic pump, and the control of the throttle and brake when the workover rig is running.

2021

12-23

greenhouse technology

Common maintenance methods for drilling rigs

Useful maintenance of machinery and equipment is divided into daily maintenance, primary and secondary maintenance. Daily maintenance is the protection of machinery and equipment in normal operation by the operator. Set up the mechanical equipment operation table and record the daily operation situation in detail. Check, clean and lubricate the machinery and equipment every day, and clean the oil cup, oil hole, oil pool and oil line every week. In the process of inspection found equipment, machinery defects or damage should be registered in a timely manner, and reported to the relevant departments, tell the repair personnel to repair in a timely manner. In the daily operation of machinery and equipment, it is necessary to strictly operate in accordance with the operating rules. Level 1 maintenance refers to the primary maintenance of machinery and equipment within a certain period of time when the equipment and machinery are operated. Under normal circumstances, the time of first-level maintenance can be regulated according to the specific maintenance requirements of machinery and equipment. Assuming that there are no rules, a reasonable confession can be made according to the actual situation, such as 600 hours. In the first-level maintenance, technicians dredge the oil circuit of machinery and equipment, fasten parts, replace felt pads, and disassemble and maintain messy parts. 3. The workover rig manufacturer indicates that it is necessary to maintain the machinery and equipment after the normal operation of the machinery and equipment exceeds 3000 hours, I .e. secondary maintenance. Check whether the parts are worn, replace and wipe them, adjust the operation accuracy of mechanical equipment, and improve the operation quality. Check and repair the electrical system by the electrical personnel.

2021

11-30

greenhouse technology

Introduction to the composition of workover rig

Downhole operation equipment is a set of comprehensive equipment that provides power for the repair or replacement of downhole string or wellbore. There are many workover equipment, which can be divided into power equipment, tripping equipment, rotating equipment, circulation equipment, wellhead control devices, etc. according to performance and use. Among them, the workover rig is a very basic and main power source in downhole operation and construction. The composition and classification information of the workover rig will be detailed as follows: 1. Power-driven equipment The power drive equipment is the power source of the workover rig, which is mainly composed of diesel engine, gearbox and other equipment to provide power for all working equipment of the workover rig. 2. Transmission system equipment The transmission system equipment connects the power equipment with the working unit. The working unit is mainly composed of transmission components and control components such as transfer case, angle transmission case, transmission shaft, etc. It is used to transmit power and distribute power. 3. Walking system equipment Travel system equipment provides transportation support for the workover rig, mainly including frame assembly, suspension assembly, axle assembly, brake system and other components. 4. Working system equipment The working equipment is the equipment for the downhole operation of the workover rig, which is mainly composed of the rotating system and the lifting system.

2021

11-22

greenhouse technology

How to maintain the workover rig daily

1 Maintenance of workover rig parts. If the hydraulic equipment of the workover rig fails, it will affect the normal operation of the entire equipment. Therefore, the maintenance of hydraulic equipment is very important for workover rig. It must be remembered that the pressure of the hydraulic system cannot be adjusted casually on site, because it has been adjusted before leaving the factory. And when replacing the hydraulic oil, remember not to open the manhole cover. If the working environment is poor and dusty, the filter element should be cleaned and replaced regularly. Also pay attention to check whether the oil level in the car is stable. 2. For the maintenance of the transmission part, first check the degree of chain wear of each part, such as rollers, bearings, etc., to ensure that the oil level of the chain box is stable. Pay attention to check whether the dead end and live end of the brake belt are accurate, and replace them in time if there is any change. Pay attention to the degree of wear between the bearing and the transmission device, and add grease in time. Such as smooth oil level of gearbox, abnormal noise, abrasion of crown block pulley bearing, abrasion degree of traveling block hook pulley bearing, etc. It is worth noting that the height of the brake handle can be adjusted. If the adjustment is not correct, it may happen that the brake cannot be braked or the idling traveling car cannot be lowered. The correct adjustment height is 3-5mm. Finally, remember to check the connecting bolts of each part frequently to see if they are loose. The maintenance of the gas path system is related to the above two parts, and the maintenance of the gas path system is relatively simple. Check the main drain valve and dryer for air leakage and outstanding working condition. Check whether the belt tension of the pump is correct. Pay attention to the rubber pipeline of the gas path system for aging or cracking, and repair it in time. Also pay attention to the components, pipes and joints of the gas pipeline system to see if there is any leakage or looseness.
< 1...456...17 > proceed page