Safety precautions for oil workover rig operation
Release time:
2022-03-04
1. Pay attention to concentration during operation, and do not neglect
2. The operation shall be smooth. It is strictly forbidden to lift, release, brake or mound violently.
3. When lifting the derrick, each hydraulic handle should be lifted gently, and pay close attention to the lifting process of the derrick.
4. Reasonable selection of gear and lifting speed according to hook suspension weight
5. Strictly control the lowering speed of the hook to prevent the brake failure and the pier drilling accident
6. When the hanging weight of the hook reaches more than 30 tons, the auxiliary brake should be used to reduce the descent speed of the hook and reduce the wear of the brake block and brake. It is strictly forbidden to hang the water brake on the way of lowering the hook.
7. Pay attention to observe the temperature of circulating cooling water, not more than 66 degrees
Related News
Trailer Hanging Daily How to Maintain
2023-12-09
Characteristics of drilling rig
2022-08-25
Contact Us
E-mail:admin@wanglianjt.cn
North 200 Meters West of the Intersection of Xindong Road and Gaoyang Avenue, Hualong District, Puyang City, Henan Province
SAF Coolest v1.3.1.2 设置面板 NQISD-ZDTD-JAAEE-ZQS
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or returnHome Page
