Puyang Wanglian Machinery Equipment Co., Ltd
Puyang Wanglian Machinery Equipment Co., Ltd
MORE +
Puyang Wanglian Machinery Equipment Co., Ltd
Puyang Wanglian Machinery Equipment Co., Ltd
MORE +
scroll down

Products


Workover rig Rig Cementing equipment Oil accessories
It is mainly used for operations such as well depth ≤ 4000m, workover of oil and water wells, drilling of oil, water wells and coalbed methane wells, deepening drilling in casing of production oil wells, and opening window logging.
XJ1350(XJ550) workover rig is a vehicle-mounted workover equipment with a maximum hook load of 1350KN, a derrick height of 33m, a workover depth of 7000m(73mmEUE), a nominal overhaul depth of 5500m(3-1/2 drill pipe) and a drilling depth of 2000m(114mm drill pipe).
XJ1600(XJ650) workover rig is a vehicle-mounted workover equipment with a maximum hook load of 1580KN, a derrick height of 34m, a workover depth of 8500m(73mmEUE), a nominal overhaul depth of 5500m(3-1/2 drill pipe), and a drilling depth of 2500m(114mm drill pipe).
XJ2250(XJ850) workover rig is a vehicle-mounted drilling and workover equipment with a maximum hook load of 2250KN, a derrick height of 38m, a workover depth of 9000m 27/8 drill pipe and a nominal overhaul depth of 7500m(3-1/2 drill pipe). Drilling depth 4000((41/2 ").
ZJ15/XJ1350 truck-mounted drilling rig is a truck-mounted drilling equipment with a hook load of 1350KN, a derrick height of 33m, a workover depth of 6000m(73mmEUE) and a drilling depth of 1500m(4 1/2 "DP). It is mainly used for well depth ≤ 6000m, workover of oil and water wells, drilling of oil and water wells, coalbed methane wells, deepening drilling in casing of production oil wells, opening window logging and other operations.
ZJ20/XJ1580 vehicle-mounted drilling equipment, hook load 1580KN, derrick height 34m, workover depth 7000m(73mmEUE), nominal overhaul depth 5800m(3-1/2 drill pipe). Drilling depth 2000m((4 1/2 "DP)).
ZJ30/XJ1800 truck-mounted drilling rig is a 3000-meter truck-mounted drilling rig independently developed by our company. It adopts a dual-engine parallel-vehicle power system. The gear parallel-vehicle can realize power switching between vehicle driving and drilling operation, and either engine is single or parallel-vehicle working.
ZJ40/XJ2250 truck-mounted drilling rig is special equipment for oil mines, with hook load of 2250KN, derrick height of 38m, workover depth of 9000m 2 7/8 drill pipe nominal overhaul depth of 7500m(3-1/2 drill pipe). Drilling depth 4000((4 1/2 ").
Cementing dual machine features: all-weather oilfield cementing equipment to meet the needs of different operating areas such as land, sea and desert, and adapt to harsh environments such as extreme cold and extreme heat.
Features of single cementing machine: all-weather oilfield cementing equipment can meet the needs of different operation areas such as land, sea and desert, and adapt to harsh environments such as extreme cold and extreme heat; AMS dual-variable intelligent and electronically controlled slurry mixing system, with precise density control, leads the forefront of cementing mixing technology;
Drawworks of workover rig
Conform to API 8A specification and have the right to use API logo
The design and manufacture of the series crane conforms to API Spect 4F and 8A specifications, and has the right to use the API logo.
The derrick type is generally divided into A type, K type (front opening type), tower type and mast type, etc.
1997 year

Founded in 1997

30 million yuan

Registered capital of 30 million yuan

60000

Covering an area of 60000 ㎡

200 sets

More than 200 sets of production equipment

About Wanglian


Puyang WangIan Machinery Eouipment Co., Ltd.

The company is located in Lidong Industrial Agglomeration District, Liyang City, Henan Province. It was founded in 1997, has a registered capital of 30 million yuan, covers an area of ​​60,000 square meters, a construction area of ​​30,000 square meters, 300 employees, 200 production equipment, 4 postdoctoral staff, Nine graduate students have independent postdoctoral workstations and engineering technology research and development centers. The company is an innovative technology enterprise that produces petroleum drilling equipment and workover equipment.Complete quality management system, obtained ISO9001, API dual certification and EU CE certification, and passed the "HSE Management System Certification of Health, Safety and Environment" of PetroChina and Sinopec.

View Details

Customer Case


All Cases

News


02

2022-12

Common sense of daily maintenance of drilling mud pump

People will protect themselves and their relatives around them well, will often greet each other, and ask each other to pay more attention to their bodies. The body is the capital of the revolution. In fact, the same is true for the goods and machinery I use. I also need to get people. attention and protection. Just like the drilling mud pump, if it is not maintained frequently, it will malfunction and affect the work efficiency. During the daily maintenance of the drilling mud pump, the pump shall be carefully checked for any abnormality, whether there is any fault or not. First, take a look at whether the pressure, flow rate, temperature, current and voltage instigated by various instruments are normal, and the pump's Whether each part is deformed, discolored, deformed, leaked, infarction, etc. Then it is to smell whether there is any peculiar smell, liquid hydrocarbon, gasoline, benzene and other leaked smell, and to equip paint, rubber and other insulating burnt paste. Taste, etc.; Then listen to the rolling local sound, whether there is any abnormal sound; Then feel for overheating, vibration, etc. Only in this way can we do our daily work well and find abnormal phenomena at an early stage. If the drilling mud pump can operate normally for a long time and increase its service life, it is necessary to do a good job of daily inspection and protection, and to check regularly. If abnormal phenomena in machinery are not detected, it will affect the work. work, bring trouble, so daily inspection can not be ignored.

31

2022-10

Pay attention to daily maintenance when using the drilling rig

As a mechanized thing, the drilling rig can also be regarded as a consumable. Then we should pay attention to maintenance before, during and after use The problem. Like the same car, the better the maintenance, then from the performance, life and other aspects will be rewarded! We need to make regular checks in the following areas. 1, the main structure of the drilling rig, structural connector bolts, structural parts connecting pin shaft, the welding seam of each structural part, hanging basket structure and safety prevention The protection condition shall be checked, especially before entering the site for use, and shall be qualified. The unit of its safety performance testing, qualified rear can be used; 2. Regularly check the status of various power heads, working cylinders and drill pipes; 3. Regularly check the hoist drum anti-wire rope falling device and the height of the edges on both sides, the condition of the drum wall and the tail of the wire rope on the drum Check the number of weeks, especially the condition of the brake port should be key items at any time. Check; 4. Inspection of electrical system, the main inspection items are: Electric box setting, short circuit protection and leakage protection device, emergency power-off switch, electric box damping device, cable fixing on working device, lighting circuit, connection The ground wire must not be used as current-carrying zero line; 2. in the following areas we should always be checking 1. Check the consolidation of the wire rope end; The contents of the wire rope inspection are: the number of safety turns of the wire rope and the selection of the wire rope Installation, lubrication, Defect inspection of wire rope, such as wire rope diameter and wear, number of broken wires of wire rope, etc; 2. Check the pulley system of the drilling rig at any time. The main inspection items are: the condition of the pulley body and the anti-skipping rope device of the transition pulley; 3. Check the walking system of the drilling rig at any time. The main inspection items are: pile crane walking pipe, clamping plate and hook pipe system status, sleeper paving and so on; 3. do a good job of drilling rig maintenance records, the replacement of spare parts should have detailed records, to ensure that spare parts in the validity period of use, or. Time to grasp the time of the next replacement; 4. the drilling rig is found to be faulty, the operation shall be stopped immediately and shall not be used until the fault is eliminated.