Products
ZJ20/XJ1580 truck mounted drilling rig
Classification:
Truck-mounted drilling rig
Introduction
ZJ20/XJ1580 vehicle-mounted drilling equipment, maximum hook load 1580KN, derrick height 34m, workover depth 7000m(73mmEUE), nominal overhaul depth 5800m(3-1/2 drill pipe).
Drilling depth 2000m((4 1/2 "DP)).
The whole machine can be divided into two parts: a special self-propelled chassis with a driving form of 12 × 8; a special working device is installed for drilling and workover operations.
Derrick assembly: double-section telescopic derrick, hydraulic lifting, telescopic. The inclination angle is 3.3 °, which is adjusted by lead screw; the crane is of integral box structure, and the crane platform is provided with guardrail.
Liquid and gas control system: the hydraulic oil pump adopts gear oil pump with strong pollution resistance, reliable performance, the reversing valve adopts pneumatic control and manual control double control structure, simple operation and labor saving, and concise pipeline layout
The main brake of the winch has two options: belt brake and disc brake, and the auxiliary brake has two options: Eaton air-controlled water-cooled disc auxiliary brake and water brake.
Main purpose:
It is mainly used for well depth ≤ 7000m, workover of oil and water wells, drilling of oil and water wells, coalbed methane wells, deepening drilling in casing of production oil wells, opening window logging and other operations. The main brake of the winch has two options: belt brake and disc brake, and the auxiliary brake has two options: Eaton air-controlled water-cooled disc auxiliary brake and water brake.
Name | Parameters |
Installed power | 630HP (470KW) |
Maximum static hook load | 1580kN |
Rated hook load | KN |
Rated power of drawworks | 1200kN |
Transmission form | hydraulic machinery |
Drive form | 12 × 8 |
Nominal Drilling Depth (4 1/2 "DP) | 2000m |
Derrick height | 34m |
Drill surface height | 4.5m |
Wire rope diameter | F26/F29mm |
Hydraulic system | 14MPa |
gas path system | 0.8MPa |
swimming system | 5 x 4 |
Transport dimensions | 20.1 × 3.1 × 4.45m (including derrick) |
15.5 × 3.1 × 3m (excluding derrick) | |
Total weight | About 58000Kg |
Key words:
ZJ20/XJ1580 truck mounted drilling rig
Previous Page:
Next Page