At present, drilling rigs are widely used in geothermal, groundwater and other aspects. It uses mechanical equipment or manpower to drill holes in the ground from the ground. So what are the operating safety procedures for drilling machines?Puyang Wanglian CompanyTo introduce you to the safe operation of the drilling machine tutorial!

1. The drilling site shall be kept clean.

2. The rig installation and disassembly, to ensure correct and complete.

3. When the mast of the drilling rig is raised and lowered, the operator should stand in a safe position.

4. When the motor is started, all friction clutches of the drilling rig should be opened.

5. When the drilling rig is working, it is strictly forbidden to remove the protective cover.

6. Before the work starts, the reliability of the braking device should be checked, as well as the working performance of the friction clutch and starting device.

7. It is forbidden to check the drilling rig before the motor stops.

8. When the drilling rig is working, it is strictly prohibited to fasten any parts of the drilling rig.

9. When the drilling rig is running, it is strictly prohibited to add oil. The oiling of the upper sheave of the mast shall be carried out when the rig is stopped.

10. It is not allowed to work on the mast before the motor stops.

11. Under any circumstances, when someone is working on the upper section of the mast, no other personnel are allowed to stay under the mast.

12. In case of bad weather(Heavy rain, heavy snow, icing or strong wind above level 5)Do not work on the mast. At the same time, it is not allowed to use artificial lighting to work on the mast.

13. It is strictly prohibited to use wire rope with split strands.

14. It is strictly forbidden to touch the wire rope by hand when lifting the drilling tool.

15. The wellhead shall not be open except for the lifting of the drilling rig and the lowering of the drilling pipe.

16. In order to prevent the drilling tool or pumping tube from the well when the well is taken out of the well, the diameter must be used.15~20mmA hook made of steel rod snags.

17. When cleaning the pumping cylinder, a strong and reliable wire rope should be used to form a ring and set it at the lower end of the pumping cylinder to turn it upside down.

18. When lifting or lowering the casing with the tackle, and when the machine is fishing, all workers should leave the drilling.

19. When pulling out the casing with the jacking, in order to avoid the casing falling off, it must be fixed with each other.

20. In the case of lighting stop(At night)Drilling work should be stopped. At this time, the drilling tool should be carefully removed from the well while it is still in the well.

The above is the summary of the operation safety regulations of the drilling machine, which is believed to be of great help to your understanding of drilling! In addition, if you need a drilling machine, you can consult Puyang Wanglian Company!